This project includes building a new maintenance facility within the 100 MGD Little Miami Wastewater Treatment Plant (WWTP), located in the Cincinnati neighborhoods of East End/Columbia Tusculum. The proposed high-rate treatment (HRT) facility will be sited in the current location of the existing maintenance facility.
The project also includes demolition of the existing Incineration, Sludge Receiving, Sludge Disposal, and Odor Control buildings which already are or will be obsolete by the time of this project.