CSO 513 Project

 

 

 

Overview

The CSO 513 Partial Sewer Separation project is a stormwater separation project in the City of Reading. This project is reducing the volume of stormwater entering the combined sewer system and therefore reducing combined sewer overflows into the Mill Creek and Cooper Creek, a tributary.

 

MSD installed about 9,000 feet of storm sewer and associated infrastructure along Reading Road and some side streets.

 

 

Project Status

Here's the current project status:

 

  • Construction began in fall 2022 and was completed in spring 2024.
  • MSD's construction contractor was Sunesis Construction.